School Gym to Classrooms Time-lapse

90-second time-lapse video of Berghammer converting the old gym at Lumen Christi Catholic School in Mequon into classroom space. Progress shown is from March 8th to April 27, 2016.

Cafe Arrowhead Lobster Boil

Berghammer staff enjoy their dinners during the 18th annual Cafe Arrowhead Lobster Boil at Arrowhead High School on Friday, April 24, 2015. The popular event features lobster, steak and other delicious menu options as well as a raffle/silent auction. Proceeds benefit Cafe Arrowhead’s special education program and AHS Special Olympics.

IMG_2599

IMG_2587

IMG_2590

IMG_2593

Berghammer COSBE “Be The Spark” Tour for MPS 7th Graders

MMAC’s Council of Small Business Executives (COSBE) partners with Milwaukee Public Schools to host 50 “Be The Spark” behind-the-scenes business tours for 7th graders – exposing them to potential local jobs and careers.

Berghammer Construction — with assistance from Aurora Health Care, J.F. Ahern Co., Illingworth-Kilgust Mechanical, and Venture Electric — provided a 90 minute on-site experience at the Aurora St. Luke’s Medical Center G.I. construction project for a 7th grade class from Wedgewood Park International School, Milwaukee.

Leman USA Expansion Time-lapse

Leman USA in Sturtevant, Wisconsin.
Building expansion progress time-lapse video view from inside the building, from the start of construction to March 29th.